Abflusskennwerte in Baden-Württemberg - Abfluss-BW |
Landesanstalt für Umwelt Baden-Württemberg (LUBW) |
2000
|
|
Flood protection concepts and design flood estimation in Baden-Württemberg |
State of Baden-Württemberg, water management organizations and municipalities |
|
|
Vertiefte Sicherheitsüberprüfung von Stauanlagen - Hydrologische Grundlagen |
Land Baden-Württemberg, Wasserverbände und Kommunen |
2004 |
|
BRIDGing the scales of EvapoTranspiration (BRIDGET) |
Helmholtz Digital Earth Initiative |
01.07.2019 |
|
SmaRD-AI - Smart Research Data Management to facilitate AI in Climate and Environmental Sciences |
KIT excellence initiative |
2020-2022 |
|
Analysis of extreme rainfall at Landgut Lingental |
Privater Auftraggeber |
07/2016 |
09/2016 |
DFG Forschergruppe FOR1598 "CAOS" (Catchments as Organized Systems) |
DFG-Forschergruppe |
07/2011 |
03/2019 |
Modeling water- and substance transport in the Inn catchment in high spatio-temporal resolution |
UBA
|
11/2013 |
04/2016 |
TRUST - Sustainable, fair and environmentally sound drinking water supply for prosperous regions with water shortage |
BMBF-Joint research project |
05/2017 |
04/2020 |
Data-based flood alert system for the Goldersbach river |
Stadt Tübingen |
09/2013 |
05/2016 |
Agroforestry in Southern Africa – new Pathways of innovative land use systems under a changing climate (ASAP) |
Federal Ministry of Education and Research |
12/2019 |
11/2022 |
V-FOR-WaTer - Virtual research environment for water and terrestrial environmental research |
Ministerium für Wissenschaft, Forschung und Kunst Baden-Württemberg (MWK) |
06/2016 |
12/2018 |
Hochwasservorhersage und -steuerung der Retetionsbecken im Einzugsgebiet des Wienflusses |
Ingenieurbüro Neukirchen /
Stadt Wien
|
2005
|
2007
|
Operational flood forecasting for reservoir operation in the Ruhr river basin |
Ruhrverband
|
2003
|
2007
|
Risk-based methods for barrage design – Design values for discharge |
BMBF
|
2005/01
|
2007/12
|
Operationelles Hochwassermanagement in großräumigen Extremsituationen am Beispiel der Mittleren Elbe; Teilprojekt 2: „Analyse und Simulation extremer Abflussereignisse unter Berücksichtigung von Hochwasserschutzmaßnahmen“ |
BMBF
|
2005/07
|
2008/12
|
OPAQUE: Operational flood forecasting in headwater catchments |
BMBF
|
2006/06
|
2010/03
|
German-russian cooperation project: Integrated Water Resources Management at Wolga and Rhine |
BMBF
|
2007/05
|
2010/12
|
BIOPORE: Preferential transport of pesticides in biogenic soil structures |
DFG
|
2007
|
2011
|
Flood hazard in a changing climate |
CEDIM
|
2008
|
2011
|
Models for nutrient and pollutant balance in river basins - data base |
Umweltbundesamt
|
2010
|
2011
|
Models for nutrient and pollutant balance in river basins - model development |
Umweltbundesamt (UBA)
|
2009/11
|
2011/06
|
Integral development concepts for small alpine rivers |
Bayerisches Landesamt für
Umwelt (BLfU)
|
2010/10
|
2012/10
|
DFG Resarch Unit FOR 581 'Großhang': Coupling of Flow and Deformation Processes for Modelling the Movement of Natural Slopes |
DFG research unit |
2005 |
2013 |
Basin-wide flood regulation |
Bayerisches Landesamt für
Umwelt (BLfU)
|
2010/07
|
2013/03
|
Water-induced soil losses as a consequence of climate change |
LUBW
|
2010/10
|
2013/10
|
Discharge time series and indices for the river Elbe (1890-2006) |
Bundesanstalt für
Gewässerkunde
|
2007 |
2015 |
Impact of Climate Change on river discharge |
Landesanstalt für Umwelt Baden-Württemberg (LUBW) |
1999
|
2016 |
KOSTRA-DWD-2010 |
Landesanstalt für Umweltschutz Baden-Württemberg (LUBW) |
2016 |
2016 |