Risk-based methods for barrage design – Design values for discharge

  • Contact:

    Dipl.-Ing. Johannes Höfer, Dr.-Ing. Jürgen Ihringer 

  • Funding:

    BMBF 

  • Startdate:

    2005/01 

  • Enddate:

    2007/12 

The goal of this project was to develop and apply tools (one probabilistic, one deterministic) to estimate design discharge values required for risk-based barrage design according to DIN 19700.