Risk-based methods for barrage design – Design values for discharge
Contact:
Dipl.-Ing. Johannes Höfer,
Dr.-Ing. Jürgen Ihringer
Funding:
BMBF
Startdate:
2005/01
Enddate:
2007/12
The goal of this project was to develop and apply tools (one probabilistic, one deterministic) to estimate design discharge values required for risk-based barrage design according to DIN 19700.